Project name: Zhangjiang Power Collection Port
Project category: Office building
Project location: Zhangjiang Hi-Tech Park, Shanghai, China
Project overview:
210,000 square meters construction area;
The first phase, the cooling load is 800KW; the 80-meter well depth, a total of 53 wells, and the 65-meter well depth, a total of 27 wells; the first phase of the project is completed in May 2007;< /span>
The second phase, the cooling load is 2500KW; the well is 80 meters deep, with a total of 230 wells; the well drilling was completed in September 2007.