Panda Project of Shanghai Boehringer Ingelheim Pharmaceutical Co., Ltd.

Description

Products used for this project:TVRK/250/ELAB/FH, TVS, TVJ/700*400/ELAB/RS, TVR/160/ELAB/RE

Design requirements: The Panda project of Shanghai Boehringer Ingelheim Pharmaceutical Co., Ltd. is located at Li Shizhen Road, Pudong New District, Shanghai. According to the system design, the project’s ventilation system is divided It is the APP area and the COC area. The outer area of ​​the office building is the work area, and the inner area is the experimental area. There are 40 standard laboratories and 66 fume hoods. The room pressure is controlled by the air supply valve, and the room is equipped with a pressure sensor to verify that the room pressure is maintained at -5Pa.

Solution: Laboratory area fume hood is equipped with TVRK/250/ELAB/FH control valve, room air supply valve and indoor auxiliary exhaust valve in An infrared detector is installed on each fume cupboard. When manned, the fume cupboard is in the manned mode, that is, the average surface wind speed of the fume cupboard opening is maintained at 0.5m/s, otherwise it is 0.3m/s. There are emergency working condition and night working condition switches in the room to facilitate the staff to quickly switch the working conditions of the ventilation system. All variable air volume control valves are connected to the MODBUS network to work together, and the central monitoring room is equipped with configuration software to monitor the various states of the valve body.

Implementation effect: The face wind speed is controlled stably, the room pressure is maintained at -5pa, and the monitoring system operates normally.